    Installation sequence of medium frequency pipe bender

     

    As a key equipment, the installation sequence of the medium frequency pipe bender is very important, because once the installation sequence is faulty, it may lead to the normal operation of the equipment and even affect the stability of the work. Below I will give you a detailed introduction to the installation sequence of the medium frequency pipe bender to ensure that the equipment can operate normally.

    1. Foundation construction

    1. Basic design: Before construction, the basic design should be carried out according to the size, weight, vibration, noise and other factors of the equipment.

    2. Ground treatment: Clean the installation ground to ensure that the ground is smooth, solid, and free from settlement and water seepage.

    3. Foundation pouring: Concrete foundation is poured on the ground to ensure that the foundation is closely integrated with the ground.

    4. Foundation treatment: After the concrete foundation is poured, it should be maintained, and the next step can be carried out after the foundation is completely dry.

    Second, equipment installation

    1. Equipment handling: Select the appropriate lifting equipment according to the weight and size of the equipment to ensure that the equipment is not damaged during the handling process.

    2. Equipment installation: Install the equipment on the basis according to the design requirements, and adjust and fix it horizontally.

    3. Connecting pipelines: According to the requirements of the equipment, connect various pipelines, and carry out tight sealing treatment at the connection.

    4. Install the electrical control system: Install the electrical control system according to the requirements of the equipment, and conduct wiring and testing.

    5. Equipment commissioning: After the equipment is installed, the equipment commissioning and trial operation are carried out to ensure the normal operation of the equipment.

    Third, stability protection

    In order to ensure the stable operation of the equipment, it is also necessary to carry out stable protection for the equipment. Specific measures are as follows:

    1. Install protective devices: according to the requirements of the equipment, install a variety of protective devices, such as safety doors, stability rails, emergency shutdown switches, etc.

    2. Installation of fire fighting facilities: installation of fire fighting facilities, such as fire extinguishers, spray systems, etc., to ensure that the fire can be put out in time in an emergency.

    3. Install warning signs: Set warning signs around the equipment to inform personnel of the dangerous areas and precautions of the equipment.

    In summary, the installation sequence of the medium frequency pipe bender is very important, and the construction needs to be carefully carried out in accordance with the design requirements, and the stable protection of the equipment needs to be paid attention to. The installation work is done to ensure the normal operation of the equipment, improve production efficiency and ensure the stability of the work.