金年会 金字招牌诚信至上,金年会 金字招牌诚信至上,金年会 金字招牌诚信至上,金年会 金字招牌诚信至上

?

Chinese | English

廠(chǎng)家logo
E-MAIL:15230713671@163.com ? ? ? ? ? TEL:0086-17761570021
    News Center
    Contact us
    Contact number:0086-15230713671
    Skype: zhiguang.wu
    Email:15230713671@163.com
    Address: North Mengcun Industrial Park, Mengcun Hui Autonomous County, Cangzhou, Hebei.

    Business news
    Current position: HOME> News Center>

    Specification requirements for wire and cable in installatio

    Specification requirements for wire and cable in installation of pipe fitting equipment

     

    Requirements for installation of pipe fitting equipment + wire and cable: medium frequency power supply installation, from power transformer to medium frequency power supply three-phase wire with 120-300 square mm of insulated wire or four-core cable.The diameter of the connecting wire between the motor control cabinet of the pipe making machine and the motor of the pump station is selected: the three-phase insulated wire of 10-16 square millimeters is selected for the working pump motor.Fast feed pump three-phase wire diameter of 6-10 mm square insulation wire.Three phase conductor of gate pump motor is selected with 4 square millimeter insulated conductor.Electro-hydraulic solenoid directional valve, solenoid relief valve, stroke switch, the connecting wire diameter of the main operation table and the motor control cabinet is 0.75-1 square millimeter insulated wire or core cable.Specifications and requirements for wire and cable for installation of pipe fitting equipment

    Repair and maintenance of pipe fitting equipment

    First of all, check the fasteners of all parts of the pipe fitting equipment and make them in a tight state.Each joint of the hydraulic pump tension part of the pipe fitting equipment is equipped with oil-resistant rubber ring. If the seal is damaged or leaking oil, it should be replaced in time.If it is found that forward and backward failure, first check whether the solenoid valve action such as the solenoid valve action is normal, and then check whether the sequence valve, relief valve, or one-way unloading valve is stuck by debris phenomenon.This phenomenon is usually prone to occur when pipe fitting equipment begins to be used.If there is a phenomenon of stuck, open it and clean it with diesel oil, then reinstall it.Clean the oil tank and filter the hydraulic oil once within 1 to 2 months after the pipe fitting equipment begins to use.When cleaning the tank, the oil inlet filter of each pump should be cleaned.The above is a brief introduction to the maintenance and protection of pipe fitting equipment. I hope it can help you.

    1852-1849.

    庆城县| 永德县| 筠连县| 富裕县| 遂昌县| 古丈县| 海城市| 静海县| 且末县| 城固县| 恩施市| 北安市| 城口县| 通道| 磴口县| 汾阳市| 阜城县| 保定市| 商洛市| 纳雍县| 鱼台县| 罗山县| 锦州市| 洞口县| 新晃| 石家庄市| 东源县| 岫岩| 长宁区| 桓台县| 延吉市| 庆云县| 阜宁县| 内江市| 辽源市| 上思县| 故城县| 六安市| 凤凰县| 抚远县| 曲水县|