Chinese | English
Points to be paid attention to during the operation of pipe
Points to be paid attention to during the operation of pipe expanding machine
When operating the pipe expanding machine, the first thing the operator should do is to immediately use his left hand to place the pipe fittings directly in the mold, and he must use his left hand to open the switch. If he uses his right hand, it is corresponding.If there are iron scraps in the mould during the operation of the pipe expanding machine, the power supply of the switch should be turned off first, and then the iron scraps should be taken out.I'm doing the operation.
In expanding tube expanding machine, the movement of the steel tube is the use of translation methods, smooth action comparison precision, but also not damage to the steel tube, is not about steel tube expanding machine models using hot air circulation heating method, mainly the double heating, in which each furnace is equipped in several heating furnace core.
The molding method of steel tube expanding machine uses the internal finalization of the pipe expanding head and the qualitative method of external pressure. The molding scale of the pipe orifice is very precise. A solvent expanding acceptance port is set on the control panel of the steel tube expanding machine, and the transfer switch of the sealing ring type socket of the bomb expanding function is also provided.In the middle of the mouth is also can be divided into rising block rise first and after the rise block rise method.
The application of pipe expanding method of steel tube expanding machine is very convenient and has a very strong adaptability, during which the main electrical control components are imported components, and so that the system of steel tube expanding machine is more stable or very reliable.
1566-1538.