The operation process of the customer after ordering the th
The operation process of the customer after ordering the three-way machine
Three - way machine operators must be trained to master the three - way machine performance and operation technology before they can operate independently.
Before operation, all kinds of sundries on the mold should be cleaned and the dirt on the tee machine cleaned.
The three-way machine must be installed under the condition of power failure to avoid collision on the start button, handle and pedal switch.
Install the upper and lower molds in alignment, adjust the mold clearance, do not allow unilateral deviation from the center, after confirming the mold pressure test.
First, start idling for 5 minutes, and check whether the mailbox position is enough, whether the sound of the oil pump is normal, whether the hydraulic unit and pipeline joints and pistons leak.
Start the three-way machine pressure test, need to check whether the pressure reaches the working pressure, equipment action is normal and reliable, there is no leakage phenomenon.
Adjust the working pressure, but should not exceed 90% of the rated pressure of the equipment, test the pressure of a piece of work, after passing the inspection in production.
For different profiles and workpieces of hydraulic press, when pressing and correcting, the working pressure and pressure of the press are adjusted, and The Times and time of holding pressure are ensured, and the mold and workpieces are not damaged.
When the body pressure plate slides up and down, it is forbidden to put your hand and head into the pressure plate and the working part of the mold.
It is strictly forbidden to knock, stretch, welding and cutting, bend and distort the work while pressing.
Do not smoke, welding, cutting, fire around the three-way machine, and do not store inflammable and explosive articles. Take fire precautions.
After the three-way machine is finished, the power supply should be cut off, the hydraulic rod of the press should be wiped clean, the lubricating oil should be added, and the mold and workpiece should be cleaned and placed neatly.
The above is the company on the three-way machine before operation and start to use the process flow. Hope customers order three - way machine to follow the above process operation. Thank you very much!