Chinese | English
Installation steps of medium frequency pipe bender
Medium frequency pipe bending machine is a machine used for processing metal pipes, its main role is to bend the pipe into the desired shape. Before using the medium frequency pipe bender, you first need to install, the following will introduce the installation steps of the medium frequency pipe bender:
1. Equipment acceptance
Before installation, check the equipment to ensure that the equipment is free from damage, errors, omissions, and meets quality requirements. The specific steps are as follows:
1. Check whether the device is in good condition and its components are complete.
2. Check whether there are foreign objects inside the device and clean up the debris inside the device.
3. Check whether the equipment bearing, motor, reducer, hydraulic system and other components are normal.
4. Check whether the electrical control system of the device works properly, including switch buttons, cables, and cables.
5. Check whether the hydraulic oil of the equipment is enough and whether the hydraulic oil is clean.
6. Check whether the working pressure, voltage, and power of the device meet requirements.
2. Infrastructure preparation
Before the installation of the medium frequency pipe bender, some infrastructure preparation work is also required to ensure the stability and reliability of the installation and use of the equipment. The specific steps are as follows:
1. Select the installation position and ensure that the distance between the device and the surrounding environment meets requirements.
2. According to the size and weight of the equipment, choose the appropriate foundation construction method.
3. Clean and level the floor to ensure that the equipment is placed smoothly.
4. Install the power supply and related devices, such as cables, sockets, and junction boxes, as required.
5. Provide sufficient ventilation space for the device to ensure heat dissipation and stable operation of the device.
Third, equipment installation
After the preceding preparations are complete, you can install the device. The specific steps are as follows:
1. Disassemble the components of the medium frequency pipe bender and assemble and install them according to the requirements of the installation drawings.
2. Connect and secure the components according to the installation drawings.
3. Check whether all parts of the device are secure and interfaces are tight.
4. Adjust and verify the device to check whether the device is working properly.
Perform electrical connection, commissioning and testing of the equipment to ensure the normal operation of the equipment electrical system.
6. Debug and test the hydraulic system of the equipment to ensure normal operation of the hydraulic system.
Fourth, equipment debugging and trial operation
After the equipment is installed, it is necessary to debug and trial run the equipment to ensure the stable operation of the equipment and the maximum production efficiency. The specific steps are as follows:
1. Debug the device according to the operation manual to ensure that all control parameters of the device are normal.
2. Test run the equipment, simulate the production process, and check the operating status and work efficiency of the equipment.
3. Perform a load test on the device to check its working performance and stability.
4. Adjust and optimize the equipment according to the results of the trial operation to ensure the stable operation of the equipment and the maximum production efficiency.
Through the above steps, the installation of the medium frequency pipe bender is completed. In daily use, regular maintenance and maintenance are also needed to ensure the long-term stable operation and service life of the equipment.
For more information about medium frequency pipe bending machine, please pay attention to our website: http://www.aocsb.com